2024 Facade Awards UK shortlist revealed!
All details are taken from entry forms and are deemed to be correct at the time of publication. If you believe any details are incorrect, please contact eventsteam@markallengroup.com immediately.
To view the shortlist in more detail, please click here.
Projects in the North of the UK
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. The project should have been built on time, within budget and either met or exceeded client's expectations, all of which will be looked on favourably.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
CO-OP Live, Manchester - Lindner Prater with CGL Systems
Eden at New Bailey – Muse with Viritopia
Hazel Bank - MAR Design with San Anselmo
Manchester Waters – Vermont with RGB Facades
Molo Hotel - Task Contract Services with Proteus Facades
Morriss House - RG Group with Aliva UK
Stockport Interchange - Precision Facades with Wienerberger and Genius Facades
Teeside BIOS - Aspect Facades with BTS Facades and Fabrications
The Social Hub, Glasgow – Walsin with Permavent
Projects in the South of the UK
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. The project should have been built on time, within budget and either met or exceeded client's expectations, all of which will be looked on favourably.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Godolphin and Latymer School - SD Samuels with Ash and Lacy and Kingspan
Grange Farm, Great Raveley - DDGL Construction with Mill Works
Heathlands School – Gemstone with James Hardie
Oval Village - Berkeley Homes Group with BTS Fabrications
Sawston University Campus – Vertec with Proteus Facades
The Stage, London - Far East Facades (UK)
West End Gate - Eden Facades with Proteus Facades
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking at the overall building from its original form and how the transformation has greatly improved the aesthetics of the new refurbishment. Before and after images will greatly help in this category. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Ardings & Hobbs – OAG with Proteus Facades
BHS Stockport - Cubic Facades with RGB Facades
Explore - Eton House - SD Samuels with Metsec, Ash and Lacy, and Aquarian
Gary Court - Hamilton (Building Contractors) with Valcan
Julian Markham House - Topek Southern (TSL) with EH Smith and Alsecco
Meadows Estate - Eden Facades with PermaRock
The White House - DW Fascias with Cedral
York Teaching Hospital façade upgrades - Vital Energi with D&B Facades
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for a brick slip system that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Amber Vista Development, Lakeside, Cardiff - Silver Crescent Developments with Aquarian Cladding Systems in partnership with Ash & Lacy
Cortland Broad St. - RG Group with Aliva UK
EdCity - Bowmer + Kirkland with Stofix UK
Explore - Eton House - SD Samuels with Ash and Lacy and Aquarian
Morriss House - RG Group with Aliva UK
Victoria House - Complete Wall Solutions with Alsecco
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for a composite panel system made from any hard metal material, which has been installed to a very high standard on either a new build or refurbishment project. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Eden Project - New Bailey - Lester Cladding North West with Eurobond
Wendys & Dunkin - Crowclad Roofing with Kingspan and Gordian Building Solutions
The judges will be looking for a curtain walling system, which has been installed to a very high standard on either a new build or refurbishment project. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Aldgate Phase 2 Block A - Commercial Space - McLaren Construction with English Architectural Glazing
One City Park - CCL Facades with Wicona
The Stage, London - Far East Facades (UK) with Far East Facade (Hong Kong)
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for an aluminum panel system that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Godolphin and Latymer School - SD Samuels with Ash and Lacy, and Kingspan
Hotel Indigo – Coventry - Lester Cladding North West with Kingspan Facades
Sawston University Campus – Vertec with Proteus Facades
Stepping Hill (Hospital) – Stockport – Longworth with Genius Facades
The Stage Building 5 - Alliance Facades with Sotech
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for a glass, ceramic or stone system that has been installed on either a newbuild or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Cambridge Golf & Country Club - Roof Brothers with Cupa Clad
Houndshill, Blackpool – Longworth with Shackerley (Holdings) Group
New Garden Square - Datum Group with Shackerley
Stockport Interchange – Longworth with AlterEgo Facades
Travelodge, Abbey Wood - A²O Facades with CUPA PIZARRAS
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for a specialist metal product that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Specialist metals include, but are not limited to, Zinc, Copper & Brass
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Arding & Hobbs – OAG with Proteus Facades
Folded Plate Zinc Extension - Sunningdale Homes with VM Zinc
Molo Hotel - Task Contract Services with Proteus Facades
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for a timber clad product that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. If it’s a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Grange Far,. Great Raveley - DDGL Construction with Mill Works
Kendon House - Southmead Hospital - Central Group with NORclad
Northampton Boys School - Marksman Roofing & Cladding with Vincent Timber
Oakley Grove School - Sage Building Envelopes Contractors with Vincent Timber
Unusual Rigging Head Office - 1-Eighty Roofing Solutions with Vincent Timber
The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.
The judges will be looking for a fibre cement product that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Bolton Hospital - Cubic Facades with RGB facades
Chepstow - PH Carpentry with Cedral
Cinnamon Building - FK Group with Rockpanel with Gordian Building Solutions
Graham Court - Able Construction (Northern) with James Hardie
Heathlands School – Gemstone with James Hardie
The Ferryman - Beam Contracting with James Hardie
The White House – DW Fascias with Cedral
The judges will be looking for the high level of creativity and innovation of your new product in terms of but not limited to: materials used to make it, its method of application or the way its made. The judges may also be looking to see how well the product has improved, complemented or innovated an existing project.
Sponsored by
Certus™ - ACS Stainless Steel Fixings
CGL Systems – Drained and Back Ventilated LED Hook-on Rainscreen Façade System
James Hardie - 11mm Hardie® Panel
Kingspan Insulation - AlphaCore Pad
Stofix – Stofix Brick Slip system
The judges will be looking for a new build or refurbishment project that has utilised a system or methods that demonstrate good sustainable and environmental awareness.
With regards to a refurbishment project, judges will be looking to see how well the product has improved/ complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.
Qualifying projects must be completed between 1 June 2023 and 1 June 2024.
Sponsored by
Eden Project - New Bailey - Lester Cladding North West and Muse with Viritopia
Slough EFW Multifuel Powerplant - MAC Roofing & Contracting with Euroclad