2024 Facade Awards UK shortlist revealed!



All details are taken from entry forms and are deemed to be correct at the time of publication.   If you believe any details are incorrect, please contact eventsteam@markallengroup.com immediately.


To view the shortlist in more detail, please click here.

9
Best new build project - North

Projects in the North of the UK

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. The project should have been built on time, within budget and either met or exceeded client's expectations, all of which will be looked on favourably.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by


CO-OP Live, Manchester - Lindner Prater with CGL Systems

Eden at New Bailey – Muse with Viritopia

Hazel Bank - MAR Design with San Anselmo

Manchester Waters – Vermont with RGB Facades

Molo Hotel - Task Contract Services with Proteus Facades

Morriss House - RG Group with Aliva UK

Stockport Interchange - Precision Facades with Wienerberger and Genius Facades

Teeside BIOS - Aspect Facades with BTS Facades and Fabrications

The Social Hub, Glasgow – Walsin with Permavent

7
Best new build project - South

Projects in the South of the UK

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. The project should have been built on time, within budget and either met or exceeded client's expectations, all of which will be looked on favourably.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by


Godolphin and Latymer School - SD Samuels with Ash and Lacy and Kingspan

Grange Farm, Great Raveley - DDGL Construction with Mill Works

Heathlands School – Gemstone with James Hardie

Oval Village - Berkeley Homes Group with BTS Fabrications

Sawston University Campus – Vertec with Proteus Facades

The Stage, London - Far East Facades (UK)

West End Gate - Eden Facades with Proteus Facades

8
Best refurbishment project

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. 

The judges will be looking at the overall building from its original form and how the transformation has greatly improved the aesthetics  of the new refurbishment. Before and after images will greatly help in this category. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by



Ardings & Hobbs – OAG with Proteus Facades

BHS Stockport - Cubic Facades with RGB Facades

Explore - Eton House - SD Samuels with Metsec, Ash and Lacy, and Aquarian

Gary Court - Hamilton (Building Contractors) with Valcan

Julian Markham House - Topek Southern (TSL) with EH Smith and Alsecco

Meadows Estate - Eden Facades with PermaRock

The White House - DW Fascias with Cedral

York Teaching Hospital façade upgrades - Vital Energi with D&B Facades

6
Best use of a brick slip cladding system

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. 

The judges will be looking for a brick slip system that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by



Amber Vista Development, Lakeside, Cardiff - Silver Crescent Developments with Aquarian Cladding Systems in partnership with Ash & Lacy

Cortland Broad St. - RG Group with Aliva UK

EdCity - Bowmer + Kirkland with Stofix UK

Explore - Eton House - SD Samuels with Ash and Lacy and Aquarian

Morriss House - RG Group with Aliva UK

Victoria House - Complete Wall Solutions with Alsecco

2
Best use of a composite panel system

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project. 

The judges will be looking for a composite panel system made from any hard metal material, which has been installed to a very high standard on either a new build or refurbishment project. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by 



Eden Project - New Bailey - Lester Cladding North West with Eurobond

Wendys & Dunkin - Crowclad Roofing with Kingspan and Gordian Building Solutions

3
Best use of a curtain walling system

The judges will be looking for a curtain walling system, which has been installed to a very high standard on either a new build or refurbishment project. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by


Aldgate Phase 2 Block A - Commercial Space - McLaren Construction with English Architectural Glazing

One City Park - CCL Facades with Wicona

The Stage, London - Far East Facades (UK) with Far East Facade (Hong Kong)

5
Best use of a rain screen system using aluminium

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.

The judges will be looking for an aluminum panel system that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by



Godolphin and Latymer School - SD Samuels with Ash and Lacy, and Kingspan

Hotel Indigo – Coventry - Lester Cladding North West with Kingspan Facades

Sawston University Campus – Vertec with Proteus Facades

Stepping Hill (Hospital) – Stockport – Longworth with Genius Facades

The Stage Building 5 - Alliance Facades with Sotech

5
Best use of a rain screen system using glass, ceramics or stone

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.

The judges will be looking for a glass, ceramic or stone system that has been installed on either a newbuild or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by

 

Cambridge Golf & Country Club - Roof Brothers with Cupa Clad

Houndshill, Blackpool – Longworth with Shackerley (Holdings) Group

New Garden Square - Datum Group with Shackerley

Stockport Interchange – Longworth with AlterEgo Facades

Travelodge, Abbey Wood - A²O Facades with CUPA PIZARRAS

3
Best use of a rain screen system using specialist metals

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.

The judges will be looking for a specialist metal product that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Specialist metals include, but are not limited to, Zinc, Copper & Brass

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by



Arding & Hobbs – OAG with Proteus Facades

Folded Plate Zinc Extension - Sunningdale Homes with VM Zinc

Molo Hotel - Task Contract Services with Proteus Facades

5
Best use of a timber clad system

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.

The judges will be looking for a timber clad product that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. If it’s a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by



Grange Far,. Great Raveley - DDGL Construction with Mill Works

Kendon House - Southmead Hospital - Central Group with NORclad

Northampton Boys School - Marksman Roofing & Cladding with Vincent Timber

Oakley Grove School - Sage Building Envelopes Contractors with Vincent Timber

Unusual Rigging Head Office - 1-Eighty Roofing Solutions with Vincent Timber

7
Best use of fibre cement cladding panels

The judges will be looking at the overall look of a building, including the architect’s design and how it complements the existing surroundings as well as the challenge and logistics involved to complete the project.

The judges will be looking for a fibre cement product that has been installed on either a new build or refurbishment project, and that has been completed to a very high standard. With regards to a refurbishment project, judges will be looking to see how well the product has improved/complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by



Bolton Hospital - Cubic Facades with RGB facades

Chepstow - PH Carpentry with Cedral

Cinnamon Building - FK Group with Rockpanel with Gordian Building Solutions

Graham Court - Able Construction (Northern) with James Hardie

Heathlands School – Gemstone with James Hardie

The Ferryman - Beam Contracting with James Hardie

The White House – DW Fascias with Cedral

5
Most innovative product

The judges will be looking for the high level of creativity and innovation of your new product in terms of but not limited to: materials used to make it, its method of application or the way its made. The judges may also be looking to see how well the product has improved, complemented or innovated an existing project.

Sponsored by


Certus™ - ACS Stainless Steel Fixings

CGL Systems – Drained and Back Ventilated LED Hook-on Rainscreen Façade System

James Hardie - 11mm Hardie® Panel

Kingspan Insulation - AlphaCore Pad

Stofix – Stofix Brick Slip system

2
Sustainable project of the year

The judges will be looking for a new build or refurbishment project that has utilised a system or methods that demonstrate good sustainable and environmental awareness.

With regards to a refurbishment project, judges will be looking to see how well the product has improved/ complemented the existing building. The project should have been built on time, within budget and have either met or exceeded the client's expectations.

Qualifying projects must be completed between 1 June 2023 and 1 June 2024.

Sponsored by 



Eden Project - New Bailey - Lester Cladding North West and Muse with Viritopia

Slough EFW Multifuel Powerplant - MAC Roofing & Contracting with Euroclad




Winners from each category will then automatically be entered into the  RCI Project of the Year

Sponsored by